Home/Services/Home refurbishments/Kitchen refurbishments

Kitchen refurbishments

If your kitchen is worn out but the room is the right size, a refurbishment can transform it without the cost and upheaval of an extension. Campbell BPS refurbishes kitchens in Leek and the surrounding area.

  • Based in Leek
  • Insured
  • Roofing, tiling and flooring by our own team
  • Trading for seven years

What a kitchen refurbishment involves

The new units and worktops get the attention, but a lot of the work happens before they arrive. We take out the old kitchen, repair or re-plaster the walls, level and prepare the floor and make sure the room is ready. After that comes the finishing, which can include tiling the splashbacks and laying a new floor. Our own team does the plastering, tiling and flooring.

We can supply and fit your kitchen, or fit one you've already chosen yourself.

We arrange any electrical and plumbing work as part of the job, so you don't have to find your own tradespeople.

Getting the layout right

A refurbishment is the best time to rethink how the kitchen works. If the sink, hob or fridge are in the wrong place, moving them means moving pipes and cables, and that's much easier to do before the new floor and tiles go in. Spend some time deciding on the layout and tell us early, so the work gets done in the right order.

Things to think about before you start

01

Lead times

Kitchen units can take weeks to arrive. It's usually best to order before the work starts, so you're not waiting around.

02

Cooking in the meantime

You'll be without a kitchen for a while. Many people set up a temporary one in another room. We'll tell you when the old kitchen needs to go.

03

Opening the room up

If you'd like to knock through into the next room, that's structural work. See our page on structural alterations.

Our step-by-step guide to planning a kitchen refurbishment covers the decisions to make before you start.

Questions we hear

How long does a kitchen refurbishment take?

It depends on the size of the room and how much needs doing. We'll give you a timescale once we've seen it.

Do I buy the kitchen myself?

Both options are available. We can supply and fit your kitchen, or fit one you've already chosen yourself.

Can you move the sink or the hob?

Usually, yes, though it depends on where the pipes and cables run. We'll look at what's possible when we visit.

Ready to talk about your kitchen?

Call 07538 338 872 or send us a message and we'll arrange a time to see it.