How to plan a kitchen refurbishment, step by step

The short answer

The secret to a smooth kitchen refurbishment is planning it properly before anything gets pulled out. Decide how you use the room, set a budget, get the layout right, order early and know how long you'll be without a kitchen. Here are the steps in the order that works best.

Step 1: Think about how you use the kitchen

Before you look at a single cupboard door, think about how you live. Do you cook a lot? Do you eat in the kitchen? Do you have children, or do you entertain? What annoys you about the kitchen you have now? Your answers will shape everything else.

Step 2: Set a budget

Decide how much you want to spend overall, and not only on the units. Remember to allow for worktops, appliances, flooring, tiling, lighting, plumbing, electrics, plastering and decorating, as well as the fitting itself. Keep a little in reserve for surprises.

Step 3: Decide on the layout

The layout matters more than the style. If you're keeping the same layout, the job is simpler. If you want to move the sink, the cooker or a wall, there's more to think about, including pipework, wiring and possibly structural alterations. Think about how you move between the sink, the hob and the fridge, and leave enough space to work.

Step 4: Choose your units, worktops and appliances

This is the fun part. Visit showrooms, look at samples and think about what's practical as well as what looks good. Check the measurements of appliances before you commit. If you'd like us to supply the kitchen, we can. If you've already chosen your own, we can fit it for you.

Step 5: Plan the services

Kitchens need plenty of power, water and ventilation. Think about where sockets, lights, taps and appliances need to go, so the electrical and plumbing work can be done at the right time. We arrange the electrical and plumbing work as part of the job.

Step 6: Order early

Some kitchens take weeks to arrive, and it's much better to have everything on site before the old kitchen comes out. Check what's in stock, what needs ordering and what the lead times are.

Step 7: Plan for life without a kitchen

You'll probably be without a working kitchen for a while. Set up a temporary space with a kettle, a microwave and a few essentials, and think about how you'll manage meals. Telling us about any particular needs in advance helps us plan around them.

Step 8: The work itself

A typical kitchen refurbishment runs in this order:

  • The old kitchen is removed.
  • Any building work, such as moving a wall, is carried out.
  • First fix electrics and plumbing go in.
  • Walls and ceilings are plastered.
  • The new units are fitted.
  • Worktops go in, then second fix electrics and plumbing.
  • Tiling and flooring are finished.
  • Final checks and a tidy up.

The exact order depends on the job, and we'll talk you through yours.

Step 9: Final checks

Before everything is signed off, go through the kitchen with your builder. Test the taps and appliances, open and close every door and drawer, and check the finish. It's much easier to have small things fixed straight away.

Do you need permissions?

A straightforward kitchen refurbishment doesn't usually need planning permission. Some work, such as electrical changes or structural alterations, can have rules attached. Talk to us about what's involved in your project.

How Campbell BPS can help

We can plan, supply and fit your kitchen, or fit one you've chosen yourself. Take a look at our kitchen refurbishments page or get in touch.