Home/Guides and advice/Building regulations for home extensions

Building regulations for home extensions: what you need to know

The short answer

Almost every house extension needs building regulations approval, whether or not it needs planning permission. Building regulations set minimum standards for how the work is done, and building control checks that those standards are met. Getting this right protects your safety, and it matters when you come to sell.

Planning and building regulations are different

Planning permission is about whether an extension is acceptable in principle, including how it looks and how it affects your neighbours. Building regulations are about how it's built. An extension can be fine on planning and still fail on building regulations, and the other way round. You often need both. Our guide on planning permission for extensions covers the planning side.

What building regulations cover

The rules cover a wide range of things. For an extension, the main ones are:

  • Structure. Foundations, walls, floors, roofs and any steel beams must be strong enough.
  • Damp and moisture. The building needs to keep water out.
  • Energy efficiency. Walls, roofs, floors and windows must meet insulation standards.
  • Drainage. Waste and surface water must be dealt with properly.
  • Fire safety. This includes escape routes, fire-resistant materials in some places and smoke alarms.
  • Ventilation. Rooms need adequate airflow, especially kitchens and bathrooms.
  • Electrical safety. New wiring must meet the standards.
  • Glazing and safety. Glass in certain places needs to be safety glass, and stairs and guarding must meet the rules.

How to apply

There are two main routes.

Full plans application. You submit detailed drawings and specifications. Building control checks them and, if they comply, approves them before work starts. This is the usual choice for extensions, because you know where you stand before the building begins.

Building notice. You tell building control you're about to start work, and they inspect as it goes. It's quicker to start, but it carries more risk, because problems may only come to light once the work has been done.

Building control can be provided by your local council or by a private approved building control body. Either way, the standards are the same.

Inspections

A building control officer will visit at key stages. For an extension, this usually includes:

  • The foundation trenches, before the concrete goes in.
  • The damp-proof course.
  • The drains, before they're covered.
  • Structural elements such as beams.
  • Insulation, before it's covered up.
  • A final inspection when the work is finished.

Your builder normally arranges these, and it helps to have a builder who plans the work around them.

The completion certificate

When the work has passed its final inspection, you receive a completion certificate. Keep it safe. A solicitor will ask for it when you sell, and its absence can hold up a sale.

Some work can be self-certified

Certain work, such as some electrical and gas work and window installation, can be carried out by installers registered with an approved scheme. They can certify that their work meets the regulations. Ask your builder which parts of your project are covered this way.

What if you skip it?

If work is done without approval, the council can take enforcement action, and you may be asked to open up the work for inspection or to alter it. It also makes the property harder to sell. It's far easier, and often cheaper, to get it right first time.

How Campbell BPS can help

We plan our work around the inspections building control needs to make. If you'd like to talk through your extension, take a look at our house extensions page or get in touch.